The first week has gone really well with the weather being on our side. We have managed to dig out the 7th lake into the approach and installed some of the metal uprights, that will hold the sleeper wall in place.

7th lakeDSC_0532

7th approachDSC_0534

Moving onto the 8th, the new paths have been dug out and boarded at the sides, with a hard base put in ready for the concrete.DSC_0541

As some of you might have seen when driving in, the 8th bunkering is really starting to take shape. The greenside bunkers have been shaped ready for liner and top soil, which will be finished next week. The white lines you see on the bunkers, will be  the height of the sand.

When you look at the photos of the 8th green bunkering below, you will see the blue flags dotted around which will represent the edge of the new sleeper wall. These two holes are really starting to take shape and will look amazing when finished.

DSC_0523

DSC_0526