4TH WEEK UPDATE

We have had a very wet week which has put us back on turfing the bunkers on 9th. Luckily we are ahead of schedule on the lake edging and on schedule for the pathways. All contractors are not working christmas week, but all will be back starting on the 4th Jan. Irrigation will start on the 4th so more machinery will be arriving at the start of that week. Below i have up loaded all the pictures from the 7th, 8th and 9th of the work we have achieved so far.

 

5 thoughts on “4TH WEEK UPDATE

  1. Peter McLoughlin's avatarPeter McLoughlin

    Is the surface on the buggy cart on the 9th the finished article or will there be a smoother top screed going on? Peter McLoughlin

    Like

    Reply
    1. andyewence's avatarandyewence Post author

      The surface will stay roughly the same because we need to make sure there is some grip there to stop a slip hazzard. The colour will fade to a very light grey. I have looked into different screening and colouring of the surface, but the cost is astronomical and within a year buggy wheel marks will appear.

      Like

      Reply
      1. Peter McLoughlin's avatarPeter McLoughlin

        Thanks for replying Andy – the work so far looks amazing and I’m really looking forward to the finished product! Cheers Peter

        Like

  2. Philip Kilgour's avatarPhilip Kilgour

    Hi Andy
    Congratulation,the work under extreme weather,looks great.
    We all hope the weather will start to improve to give your team a chance to meet the schedules.
    I keep an eye on the progress and the standards you are setting are very impressive.
    Well done the whole team.
    Philip Kilgour